Type: | Electromagnetic |
---|---|
Output Signal Type: | Digital Output |
Material: | Metal |
Samples: |
same as order
|
---|
Customization: |
---|
Shipping Cost:
Estimated freight per unit. |
about shipping cost and estimated delivery time. |
---|
Payment Method: | |
---|---|
Initial Payment Full Payment |
Currency: | US$ |
---|
Return&refunds: | You can apply for a refund up to 30 days after receipt of the products. |
---|
Suppliers with verified business licenses
Item Name
|
Battery Sensor
|
Material
|
High Quality Material
|
Place of Origin
|
China
|
Applicable
|
For Toyota
|
Sample
|
Sample is available
|
MOQ
|
1pcs
|
Packing Type
|
Neutral Carton or Original Packing
|
Part Number
|
28850-0V020 |
Delivery Time
|
About 3-7Days
|
Easy installation
1,Disconnect the negative cable and loosen the bolt with a bolt wrench.
(Note: you need to disconnect the negative cable first and then operate it)
2,Open the black cover and remove the bolt inside with a bolt wrench.
3,Remove the old battery sensor, replace it with a new one, and reconnect the cable and bolt.
Packing & Deivery
Supply Chain Management
FAQ
Q1: What's the MOQ?
A1: The minimum order quantity of each item is different, if the MOQ doesn't meet your requirements, you please don't hesitate to contact and discuss with us.
Q2: Do you accept customization?
A2: Yes, we can do as your request, you please just provide your sample or design.
Q3. How about your delivery time?
A3: Generally, 5-10 days if the goods are in stock, or it will take about 30 days. The specific delivery time depends.
Q4: What are your Payment terms?
A4: T/T, LC, PayPal, Western Union. The order amount<1000USD, 100% in advance, >=1000USD, 30% in advance, balance before shipment.
Q5: What are your terms of delivery?
A5: FOB, CFR, CIF, DDU.
Q6: Is there quality control on all production lines?
A6: Yes, all production lines will be equipped with a QC. 100% inspection before packing, Spot inspection before shipment.
Suppliers with verified business licenses